(HBO) - The Department of Transportation is implementing the construction project for renewing Trang bridge (Dong Tien Ward, Hoa Binh City). According to the plan approved by the People's Committee of the province, 36 billion VND from the provincial budget will be invested in Trang Bridge to renew at the position of Km0 + 20 Cu Chinh Lan road.

Old Trang bridge.

Specifically, Trang Bridge is newly built with the following structural scale: The bridge of 1 simple span with the length of 25m, the reinforced concrete structure and pre-stressed reinforced concrete. The design load of the bridge is HL93. Its width is 24m, in which the width of the vehicle is 12 m, the width of the road is 6m each side. The part of the road on both sides of the bridge ensures the road direction, the bridge’s length and the design altitude ensures the general planning of Hoa Binh City until 2035. The project will also carry out the renovation and the reinforcement of the upstream and downstream bridge, arranging lights to ensure urban beauty.

According to the Department of Transportation up till now, the project has completed the survey, the construction drawing design, the pile plugging to determine the clearance, preparing the cadastral files, demining bombs and explosive objects. The People's Committee of the province will approve the contractor selection plan so that the project can continue to implement on schedule.


Related Topics


Several communes in Lac Thuy district struggle to promote OCOP products

In Lac Thuy district, communes have been succeeded in promoting their One Commune-One Product (OCOP) products while others are still struggling to position their typical farming products in market. Some communes in the district still fail to have their products met OCOP programme’s requirements, while others have seen their certifications expired.

Measures sought to improve PCI’s informal component indexes

The inspectorate agency of Hoa Binh province has issued Official Dispatch No. 1090/TTr-PCTN to provincial departments, agencies, localities, business associations, enterprises, and investors regarding measures to improve informal component indexes of the Provincial Competitiveness Index (PCI).

Hoa Binh works to enhance investment climate: Responsibility, action enable Kim Boi to welcome billion-dollar projects

Hoa Binh is taking concrete steps to improve its investment environment, with a strong focus on supporting businesses, settling obstacles for strategic investors, and creating opportunities for robust development in the coming years.

Nhuan Trach industrial park accelerates construction to welcome investors

Under the blazing early summer sun, the construction site of Nhuan Trach Industrial Park (IP) in Luong Son district is abuzz with activities from dawn to dusk, a testament to the determination of the investor to meet their construction targets on schedule.